Triple
T14419234
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amtrak state-supported routes program |
E357537
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | passenger rail funding program |
C24882
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: passenger rail funding program Context triple: [Amtrak state-supported routes program, instanceOf, passenger rail funding program]
-
A.
public transportation funding program
chosen
A public transportation funding program is a structured initiative that allocates financial resources to plan, develop, operate, and maintain shared transit services and related infrastructure for the general public.
-
B.
passenger rail service
Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
-
C.
highway funding program
A highway funding program is a structured governmental initiative that allocates financial resources for the planning, construction, maintenance, and improvement of highway infrastructure.
-
D.
rail transportation infrastructure
Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
-
E.
transportation funding measure
A transportation funding measure is a policy instrument, often a ballot initiative or legislative act, that authorizes and allocates dedicated revenue sources to plan, build, operate, and maintain transportation infrastructure and services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d82793421c8190861eb0e673b085de |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:18 a.m.