Triple

T14394211
Position Surface form Disambiguated ID Type / Status
Subject Eclipse Adoptium E356915 entity
Predicate instanceOf P0 FINISHED
Object Eclipse Foundation project C23241 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Eclipse Foundation project
Context triple: [Eclipse Adoptium, instanceOf, Eclipse Foundation project]
  • A. Eclipse project chosen
    An Eclipse project is a structured collection of source files, configuration settings, and resources managed within the Eclipse IDE to develop, build, and run software applications.
  • B. Apache Software Foundation project
    An Apache Software Foundation project is an open-source software initiative governed by the ASF’s community-driven, meritocratic processes and licensed under the Apache License.
  • C. Linux Foundation project
    A Linux Foundation project is a collaborative, open-source initiative hosted under the Linux Foundation that develops and maintains software, standards, or infrastructure for the broader technology ecosystem.
  • D. Fedora project
    The Fedora Project is a community-driven open source initiative that develops the Fedora Linux distribution and related technologies, focusing on innovation, freedom, and collaboration.
  • E. open-source organization
    An open-source organization is a collaborative entity that develops, maintains, and governs software or other projects whose source materials are publicly accessible, modifiable, and distributable under open licenses.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827927c988190ad98bb0360981783 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:16 a.m.