Triple
T14388020
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GSMA Remote SIM Provisioning specifications |
E356773
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | eSIM standard |
C2787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: eSIM standard Context triple: [GSMA Remote SIM Provisioning specifications, instanceOf, eSIM standard]
-
A.
smart card standard
A smart card standard is a formal specification that defines the physical, electrical, communication, and data structures required to ensure interoperability and security for smart card technologies across different systems and devices.
-
B.
telecommunications standard
chosen
A telecommunications standard is an agreed-upon set of technical specifications and protocols that ensure compatibility, interoperability, and reliable communication across different telecom networks and devices.
-
C.
subscriber identity module
A subscriber identity module (SIM) is a secure, removable smart card or embedded chip that stores a mobile subscriber’s identity, authentication keys, and related data, enabling access to and billing on a cellular network.
-
D.
5G-Advanced standard milestone
A 5G-Advanced standard milestone is a formally defined stage in the evolution of 5G specifications that introduces significant enhancements in performance, capabilities, and features beyond initial 5G deployments.
-
E.
EPCglobal standard
EPCglobal standard is a set of specifications for using RFID and related technologies to uniquely identify, track, and share information about products and assets across global supply chains.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d827927c988190ad98bb0360981783 |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:16 a.m.