Triple

T14356197
Position Surface form Disambiguated ID Type / Status
Subject Polder Sofa E355975 entity
Predicate instanceOf P0 FINISHED
Object sofa design C33847 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sofa design
Context triple: [Polder Sofa, instanceOf, sofa design]
  • A. chair design
    Chair design is the conceptual process of creating seating that balances ergonomics, aesthetics, materials, and structural integrity to support and enhance the human sitting experience.
  • B. interior design project
    An interior design project is a planned and coordinated process of transforming an interior space’s function, aesthetics, and atmosphere through the selection and arrangement of materials, furnishings, colors, lighting, and spatial layouts to meet specific client needs and style goals.
  • C. furniture designer
    A furniture designer is a professional who conceives, plans, and creates functional and aesthetically pleasing furniture pieces by integrating form, materials, ergonomics, and manufacturing constraints.
  • D. furniture collection
    A furniture collection is a curated set of related furniture pieces designed to work together aesthetically and functionally within a space.
  • E. cantilever chair
    A cantilever chair is a type of chair supported by a single, continuous base that allows the seat to flex slightly, creating a suspended, floating appearance without traditional back legs.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d82790a7e08190877e2d349b2e8d8e completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:15 a.m.