Triple
T14307567
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Harrenhal |
E354736
|
entity |
| Predicate | constructionCompletedOn |
P23965
|
FINISHED |
| Object | the same day Aegon the Conqueror landed in Westeros |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: the same day Aegon the Conqueror landed in Westeros | Statement: [Harrenhal, constructionCompletedOn, the same day Aegon the Conqueror landed in Westeros]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: constructionCompletedOn Context triple: [Harrenhal, constructionCompletedOn, the same day Aegon the Conqueror landed in Westeros]
-
A.
constructionCompleted
Indicates that a construction process or project has been fully finished and reached its completed state.
-
B.
constructionDate
chosen
Indicates the date on which an entity (such as a building or structure) was constructed or completed.
-
C.
constructionCompletedUnder
Indicates that the completion of a construction project occurred under the responsibility, authority, or supervision of a specified agent, organization, or governing body.
-
D.
claimedConstructionDate
Indicates the date on which an entity is asserted or reported to have been constructed, according to some claim or source.
-
E.
assemblyCompletionDate
Indicates the date on which the assembly process for an item or structure is finished.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278ed42c8190b9f882dcce611347 |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de85b156b0819083f2bd319deed1b6 |
completed | April 14, 2026, 6:21 p.m. |
| PD | Predicate disambiguation | batch_69de2a8f81f08190af737e1654847aa6 |
completed | April 14, 2026, 11:52 a.m. |
Created at: April 10, 2026, 1:12 a.m.