Triple

T14307567
Position Surface form Disambiguated ID Type / Status
Subject Harrenhal E354736 entity
Predicate constructionCompletedOn P23965 FINISHED
Object the same day Aegon the Conqueror landed in Westeros LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: the same day Aegon the Conqueror landed in Westeros | Statement: [Harrenhal, constructionCompletedOn, the same day Aegon the Conqueror landed in Westeros]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionCompletedOn
Context triple: [Harrenhal, constructionCompletedOn, the same day Aegon the Conqueror landed in Westeros]
  • A. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. constructionDate chosen
    Indicates the date on which an entity (such as a building or structure) was constructed or completed.
  • C. constructionCompletedUnder
    Indicates that the completion of a construction project occurred under the responsibility, authority, or supervision of a specified agent, organization, or governing body.
  • D. claimedConstructionDate
    Indicates the date on which an entity is asserted or reported to have been constructed, according to some claim or source.
  • E. assemblyCompletionDate
    Indicates the date on which the assembly process for an item or structure is finished.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278ed42c8190b9f882dcce611347 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de85b156b0819083f2bd319deed1b6 completed April 14, 2026, 6:21 p.m.
PD Predicate disambiguation batch_69de2a8f81f08190af737e1654847aa6 completed April 14, 2026, 11:52 a.m.
Created at: April 10, 2026, 1:12 a.m.