Triple

T14307199
Position Surface form Disambiguated ID Type / Status
Subject Tongzhou District E354728 entity
Predicate hasTransport P1298 FINISHED
Object Beijing Subway Line 17
Beijing Subway Line 17 is a rapid transit line in Beijing’s subway system designed to improve north–south connectivity and serve growing residential and business areas including Tongzhou District.
E1180797 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Beijing Subway Line 17 | Statement: [Tongzhou District, hasTransport, Beijing Subway Line 17]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Beijing Subway Line 17
Context triple: [Tongzhou District, hasTransport, Beijing Subway Line 17]
  • A. Beijing Subway Line 19
    Beijing Subway Line 19 is a north–south rapid transit line in Beijing designed to enhance express connectivity between major transport hubs and central urban areas.
  • B. Beijing Subway Line 16
    Beijing Subway Line 16 is a rapid transit line in Beijing’s subway network that runs generally north–south, connecting the city’s northern suburbs with central and southwestern districts.
  • C. Beijing Subway Line 15
    Beijing Subway Line 15 is a major east–west rapid transit line in Beijing that serves northern parts of the city, connecting key residential and technology hub areas including sections of Haidian District.
  • D. Batong Line (Beijing Subway)
    The Batong Line of the Beijing Subway is an eastern suburban rapid transit line that extends the main network into the Tongzhou District, serving as a key commuter corridor for residents traveling to and from central Beijing.
  • E. Changping Line (Beijing Subway)
    The Changping Line of the Beijing Subway is a rapid transit line serving Beijing’s northern Changping District, linking suburban residential areas and university zones with the city’s urban rail network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Beijing Subway Line 17
Triple: [Tongzhou District, hasTransport, Beijing Subway Line 17]
Generated description
Beijing Subway Line 17 is a rapid transit line in Beijing’s subway system designed to improve north–south connectivity and serve growing residential and business areas including Tongzhou District.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Beijing Subway Line 17
Target entity description: Beijing Subway Line 17 is a rapid transit line in Beijing’s subway system designed to improve north–south connectivity and serve growing residential and business areas including Tongzhou District.
  • A. Beijing Subway Line 19
    Beijing Subway Line 19 is a north–south rapid transit line in Beijing designed to enhance express connectivity between major transport hubs and central urban areas.
  • B. Beijing Subway Line 16
    Beijing Subway Line 16 is a rapid transit line in Beijing’s subway network that runs generally north–south, connecting the city’s northern suburbs with central and southwestern districts.
  • C. Beijing Subway Line 15
    Beijing Subway Line 15 is a major east–west rapid transit line in Beijing that serves northern parts of the city, connecting key residential and technology hub areas including sections of Haidian District.
  • D. Batong Line (Beijing Subway)
    The Batong Line of the Beijing Subway is an eastern suburban rapid transit line that extends the main network into the Tongzhou District, serving as a key commuter corridor for residents traveling to and from central Beijing.
  • E. Changping Line (Beijing Subway)
    The Changping Line of the Beijing Subway is a rapid transit line serving Beijing’s northern Changping District, linking suburban residential areas and university zones with the city’s urban rail network.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278ed42c8190b9f882dcce611347 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de85b156b0819083f2bd319deed1b6 completed April 14, 2026, 6:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69ffa9280ed081908030a4bbea80398c completed May 9, 2026, 9:37 p.m.
NEDg Description generation batch_69ffaa5d8860819090dc3e36a32dfb3a completed May 9, 2026, 9:42 p.m.
NED2 Entity disambiguation (via description) batch_69ffaab523dc8190bbf3cd271852493b completed May 9, 2026, 9:44 p.m.
Created at: April 10, 2026, 1:12 a.m.