Triple
T14288428
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Faraday Dam |
E354239
|
entity |
| Predicate | isUpstreamOf |
P5955
|
FINISHED |
| Object | River Mill Dam |
E348351
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Mill Dam | Statement: [Faraday Dam, isUpstreamOf, River Mill Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: River Mill Dam Context triple: [Faraday Dam, isUpstreamOf, River Mill Dam]
-
A.
River Mill Dam
chosen
River Mill Dam is a hydroelectric dam on the Clackamas River in Oregon, known for power generation and its role in regional water management.
-
B.
Forestville Dam
Forestville Dam is a hydroelectric and recreational dam located on the Dead River near Marquette in Michigan’s Upper Peninsula.
-
C.
Burn Mill Dam
Burn Mill Dam is a watercourse or controlled outflow channel associated with Kinghorn Loch in Fife, Scotland.
-
D.
Rodman Dam
Rodman Dam is a controversial man-made structure in north-central Florida that created the Rodman Reservoir by impounding the Ocklawaha River as part of the partially completed Cross Florida Barge Canal project.
-
E.
Downsville Dam
Downsville Dam is a large earthen embankment dam on the East Branch of the Delaware River in New York, built as part of New York City's water supply system.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278e17088190b328c5a9d4be74ff |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de698023288190b1d705235c2b2ca3 |
completed | April 14, 2026, 4:21 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a00077201c08190a0c3bb259856d5c9 |
completed | May 10, 2026, 4:20 a.m. |
Created at: April 10, 2026, 1:11 a.m.