Triple
T14266290
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Osram-Höfe |
E353652
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former factory |
C5370
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former factory Context triple: [Osram-Höfe, instanceOf, former factory]
-
A.
former industrial plant
chosen
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
B.
recovered factory
A recovered factory is an abandoned or decommissioned industrial facility that has been restored, repurposed, or revitalized for new productive, cultural, or community uses.
-
C.
former mine
A former mine is a site where mineral extraction has ceased, leaving behind altered landscapes, structures, and potential environmental legacies from past mining activities.
-
D.
tank factory
A tank factory is an industrial facility where armored combat vehicles are designed, manufactured, assembled, and tested before deployment.
-
E.
former quarry
A former quarry is a previously excavated open-pit site where stone, minerals, or other materials were extracted, now typically abandoned, repurposed, or undergoing natural or managed reclamation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278d25148190abf1a8c8f5f533ad |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:09 a.m.