Triple

T14259065
Position Surface form Disambiguated ID Type / Status
Subject Hyderabad water supply system E353462 entity
Predicate primaryWaterSource P4360 FINISHED
Object Singur Dam E254795 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Singur Dam | Statement: [Hyderabad water supply system, primaryWaterSource, Singur Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Singur Dam
Context triple: [Hyderabad water supply system, primaryWaterSource, Singur Dam]
  • A. Singur Dam chosen
    Singur Dam is a major reservoir and irrigation dam built across the Manjira River in Telangana, India, serving as a key source of drinking water and irrigation for the region.
  • B. Naghlu Dam
    Naghlu Dam is a major hydroelectric and irrigation dam in Afghanistan, located east of Kabul and serving as a key source of power and water management for the region.
  • C. Vidraru Dam
    Vidraru Dam is a major hydroelectric dam on the Argeș River in Romania, known for its impressive arch design and scenic location in the Făgăraș Mountains.
  • D. Mula Dam
    Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
  • E. Irganai Dam
    Irganai Dam is a major hydroelectric dam in Russia’s Dagestan region, known for its large installed capacity and role in supplying power to the North Caucasus.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278c43e08190824146f4632b89a5 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de6352611c819090d062fe3079cd03 completed April 14, 2026, 3:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69fdf06f22148190a750a012397b2c68 completed May 8, 2026, 2:17 p.m.
Created at: April 10, 2026, 1:09 a.m.