Triple
T14255176
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | European Communities – Regime for the Importation, Sale and Distribution of Bananas |
E353365
|
entity |
| Predicate | implementationIssue |
P21734
|
FINISHED |
| Object | prolonged compliance and implementation disputes |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: prolonged compliance and implementation disputes | Statement: [European Communities – Regime for the Importation, Sale and Distribution of Bananas, implementationIssue, prolonged compliance and implementation disputes]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: implementationIssue Context triple: [European Communities – Regime for the Importation, Sale and Distribution of Bananas, implementationIssue, prolonged compliance and implementation disputes]
-
A.
possibleIssue
Indicates that there is a potential or suspected problem, defect, or undesired condition associated with the referenced entity or situation, though it is not yet confirmed.
-
B.
platformIssue
Indicates that there is a problem, malfunction, or limitation affecting the operation or availability of a platform.
-
C.
implementationStatus
Indicates the current state or progress of carrying out or realizing something, such as a plan, design, or requirement.
-
D.
knownIssue
chosen
Indicates that the subject has an issue or problem that is already identified, recognized, or documented.
-
E.
worksOnIssue
Indicates that an entity (typically a person or team) is actively engaged in addressing, resolving, or contributing work toward a specific issue.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278c43e08190824146f4632b89a5 |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de62992a188190bc046fbab5a149d6 |
completed | April 14, 2026, 3:51 p.m. |
| PD | Predicate disambiguation | batch_69de2a7d586c8190846ff242bbf5ac53 |
completed | April 14, 2026, 11:52 a.m. |
Created at: April 10, 2026, 1:09 a.m.