Triple

T14249333
Position Surface form Disambiguated ID Type / Status
Subject AFC (Automatic Fare Collection) E353216 entity
Predicate instanceOf P0 FINISHED
Object public transport technology C33653 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transport technology
Context triple: [AFC (Automatic Fare Collection), instanceOf, public transport technology]
  • A. urban transit technology
    Urban transit technology encompasses the systems, vehicles, infrastructure, and digital tools that enable efficient, safe, and sustainable movement of people within cities.
  • B. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • C. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • D. electric transport system
    An electric transport system is an integrated network of vehicles, infrastructure, and control technologies that enables the movement of people or goods using electricity as the primary energy source.
  • E. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278c43e08190824146f4632b89a5 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:08 a.m.