Triple

T14232332
Position Surface form Disambiguated ID Type / Status
Subject ASML E352781 entity
Predicate instanceOf P0 FINISHED
Object semiconductor equipment manufacturer C27504 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: semiconductor equipment manufacturer
Context triple: [ASML, instanceOf, semiconductor equipment manufacturer]
  • A. semiconductor equipment supplier chosen
    A semiconductor equipment supplier is a company that designs, manufactures, and provides specialized tools, machinery, and related services used in the fabrication and testing of semiconductor devices and integrated circuits.
  • B. semiconductor manufacturing facility
    A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
  • C. semiconductor manufacturing process
    The semiconductor manufacturing process is a highly controlled, multi-step sequence of fabrication, patterning, doping, and layering operations used to transform raw silicon wafers into functional integrated circuits and microchips.
  • D. electronic design automation company
    An electronic design automation company develops and provides software tools and services that enable engineers to design, simulate, verify, and optimize electronic systems and integrated circuits.
  • E. Fabless semiconductor company
    A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278adc7c8190a9218d69bce3c4e6 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:07 a.m.