Triple

T14227399
Position Surface form Disambiguated ID Type / Status
Subject Itezhi-Tezhi E352657 entity
Predicate associatedWith P37 FINISHED
Object Itezhi-Tezhi hydroelectric power project
The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
E1087112 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Itezhi-Tezhi hydroelectric power project | Statement: [Itezhi-Tezhi, associatedWith, Itezhi-Tezhi hydroelectric power project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Itezhi-Tezhi hydroelectric power project
Context triple: [Itezhi-Tezhi, associatedWith, Itezhi-Tezhi hydroelectric power project]
  • A. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Tuirial Hydroelectric Project
    Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
  • C. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • D. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • E. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Itezhi-Tezhi hydroelectric power project
Triple: [Itezhi-Tezhi, associatedWith, Itezhi-Tezhi hydroelectric power project]
Generated description
The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Itezhi-Tezhi hydroelectric power project
Target entity description: The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
  • A. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Tuirial Hydroelectric Project
    Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
  • C. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • D. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • E. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278adc7c8190a9218d69bce3c4e6 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de622a48508190bbfedb762bd1674d completed April 14, 2026, 3:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd281801488190bcb17d27ee18cde6 completed May 8, 2026, 12:02 a.m.
NEDg Description generation batch_69fd29a470a08190b18c184466bbe0a9 completed May 8, 2026, 12:09 a.m.
NED2 Entity disambiguation (via description) batch_69fd2a61842481909388c83480482aeb completed May 8, 2026, 12:12 a.m.
Created at: April 10, 2026, 1:07 a.m.