Triple
T14227399
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Itezhi-Tezhi |
E352657
|
entity |
| Predicate | associatedWith |
P37
|
FINISHED |
| Object |
Itezhi-Tezhi hydroelectric power project
The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
|
E1087112
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Itezhi-Tezhi hydroelectric power project | Statement: [Itezhi-Tezhi, associatedWith, Itezhi-Tezhi hydroelectric power project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Itezhi-Tezhi hydroelectric power project Context triple: [Itezhi-Tezhi, associatedWith, Itezhi-Tezhi hydroelectric power project]
-
A.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
B.
Tuirial Hydroelectric Project
Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
-
C.
Kopili Hydroelectric Project
Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
-
D.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
E.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Itezhi-Tezhi hydroelectric power project Triple: [Itezhi-Tezhi, associatedWith, Itezhi-Tezhi hydroelectric power project]
Generated description
The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Itezhi-Tezhi hydroelectric power project Target entity description: The Itezhi-Tezhi hydroelectric power project is a Zambian dam-based power station on the Kafue River that generates electricity by harnessing water from the Itezhi-Tezhi Reservoir.
-
A.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
B.
Tuirial Hydroelectric Project
Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
-
C.
Kopili Hydroelectric Project
Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
-
D.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
E.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278adc7c8190a9218d69bce3c4e6 |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de622a48508190bbfedb762bd1674d |
completed | April 14, 2026, 3:50 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fd281801488190bcb17d27ee18cde6 |
completed | May 8, 2026, 12:02 a.m. |
| NEDg | Description generation | batch_69fd29a470a08190b18c184466bbe0a9 |
completed | May 8, 2026, 12:09 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69fd2a61842481909388c83480482aeb |
completed | May 8, 2026, 12:12 a.m. |
Created at: April 10, 2026, 1:07 a.m.