Triple

T14223041
Position Surface form Disambiguated ID Type / Status
Subject Libba Cotten Bikeway E352545 entity
Predicate instanceOf P0 FINISHED
Object pedestrian and bicycle path C6047 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian and bicycle path
Context triple: [Libba Cotten Bikeway, instanceOf, pedestrian and bicycle path]
  • A. pedestrian walkway chosen
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • B. rail trail
    A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
  • C. pedestrian network
    A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
  • D. pedestrian bridge
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • E. parkway
    A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278a06e481908b5d6af0a8afe737 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:06 a.m.