Triple
T14220208
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sabor River |
E352468
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Feiticeiro Dam
Feiticeiro Dam is a hydroelectric and water management structure located on the Sabor River in northeastern Portugal.
|
E1098497
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Feiticeiro Dam | Statement: [Sabor River, hasDam, Feiticeiro Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Feiticeiro Dam Context triple: [Sabor River, hasDam, Feiticeiro Dam]
-
A.
Talarn Dam
Talarn Dam is a large hydroelectric and water-regulation dam on the Noguera Pallaresa River in Catalonia, Spain.
-
B.
Daivões Dam
Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
-
C.
Calanda Dam
Calanda Dam is a hydroelectric dam in Switzerland associated with the Calanda mountain region, used primarily for water storage and power generation.
-
D.
Anzalduas Dam
Anzalduas Dam is a diversion dam on the Rio Grande near the U.S.–Mexico border that helps control river flow and supports irrigation and flood management in the surrounding region.
-
E.
Nisramont Dam
Nisramont Dam is a hydroelectric and recreational dam in the Belgian Ardennes, forming a large reservoir on the Ourthe River near La Roche-en-Ardenne.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Feiticeiro Dam Triple: [Sabor River, hasDam, Feiticeiro Dam]
Generated description
Feiticeiro Dam is a hydroelectric and water management structure located on the Sabor River in northeastern Portugal.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Feiticeiro Dam Target entity description: Feiticeiro Dam is a hydroelectric and water management structure located on the Sabor River in northeastern Portugal.
-
A.
Talarn Dam
Talarn Dam is a large hydroelectric and water-regulation dam on the Noguera Pallaresa River in Catalonia, Spain.
-
B.
Daivões Dam
Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
-
C.
Calanda Dam
Calanda Dam is a hydroelectric dam in Switzerland associated with the Calanda mountain region, used primarily for water storage and power generation.
-
D.
Anzalduas Dam
Anzalduas Dam is a diversion dam on the Rio Grande near the U.S.–Mexico border that helps control river flow and supports irrigation and flood management in the surrounding region.
-
E.
Nisramont Dam
Nisramont Dam is a hydroelectric and recreational dam in the Belgian Ardennes, forming a large reservoir on the Ourthe River near La Roche-en-Ardenne.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278a06e481908b5d6af0a8afe737 |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de6213801c8190a47705cd890b9ae7 |
completed | April 14, 2026, 3:49 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fd5bb5a64c81908cb8c50bbfa239a4 |
completed | May 8, 2026, 3:42 a.m. |
| NEDg | Description generation | batch_69fd5c4520cc8190bbcb38c41e050323 |
completed | May 8, 2026, 3:45 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69fd5cf86b488190b9237d7615b25f40 |
completed | May 8, 2026, 3:48 a.m. |
Created at: April 10, 2026, 1:06 a.m.