Triple

T14220208
Position Surface form Disambiguated ID Type / Status
Subject Sabor River E352468 entity
Predicate hasDam P8736 FINISHED
Object Feiticeiro Dam
Feiticeiro Dam is a hydroelectric and water management structure located on the Sabor River in northeastern Portugal.
E1098497 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Feiticeiro Dam | Statement: [Sabor River, hasDam, Feiticeiro Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Feiticeiro Dam
Context triple: [Sabor River, hasDam, Feiticeiro Dam]
  • A. Talarn Dam
    Talarn Dam is a large hydroelectric and water-regulation dam on the Noguera Pallaresa River in Catalonia, Spain.
  • B. Daivões Dam
    Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
  • C. Calanda Dam
    Calanda Dam is a hydroelectric dam in Switzerland associated with the Calanda mountain region, used primarily for water storage and power generation.
  • D. Anzalduas Dam
    Anzalduas Dam is a diversion dam on the Rio Grande near the U.S.–Mexico border that helps control river flow and supports irrigation and flood management in the surrounding region.
  • E. Nisramont Dam
    Nisramont Dam is a hydroelectric and recreational dam in the Belgian Ardennes, forming a large reservoir on the Ourthe River near La Roche-en-Ardenne.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Feiticeiro Dam
Triple: [Sabor River, hasDam, Feiticeiro Dam]
Generated description
Feiticeiro Dam is a hydroelectric and water management structure located on the Sabor River in northeastern Portugal.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Feiticeiro Dam
Target entity description: Feiticeiro Dam is a hydroelectric and water management structure located on the Sabor River in northeastern Portugal.
  • A. Talarn Dam
    Talarn Dam is a large hydroelectric and water-regulation dam on the Noguera Pallaresa River in Catalonia, Spain.
  • B. Daivões Dam
    Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
  • C. Calanda Dam
    Calanda Dam is a hydroelectric dam in Switzerland associated with the Calanda mountain region, used primarily for water storage and power generation.
  • D. Anzalduas Dam
    Anzalduas Dam is a diversion dam on the Rio Grande near the U.S.–Mexico border that helps control river flow and supports irrigation and flood management in the surrounding region.
  • E. Nisramont Dam
    Nisramont Dam is a hydroelectric and recreational dam in the Belgian Ardennes, forming a large reservoir on the Ourthe River near La Roche-en-Ardenne.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278a06e481908b5d6af0a8afe737 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de6213801c8190a47705cd890b9ae7 completed April 14, 2026, 3:49 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd5bb5a64c81908cb8c50bbfa239a4 completed May 8, 2026, 3:42 a.m.
NEDg Description generation batch_69fd5c4520cc8190bbcb38c41e050323 completed May 8, 2026, 3:45 a.m.
NED2 Entity disambiguation (via description) batch_69fd5cf86b488190b9237d7615b25f40 completed May 8, 2026, 3:48 a.m.
Created at: April 10, 2026, 1:06 a.m.