Triple

T14207989
Position Surface form Disambiguated ID Type / Status
Subject Lake Salto E352150 entity
Predicate createdBy P806 FINISHED
Object Salto Dam
Salto Dam is a hydroelectric and water-regulation structure in Italy that impounds Lake Salto, one of the country’s largest artificial lakes.
E1094883 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Salto Dam | Statement: [Lake Salto, createdBy, Salto Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Salto Dam
Context triple: [Lake Salto, createdBy, Salto Dam]
  • A. Salto Grande Dam
    Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
  • B. Rapel Dam
    Rapel Dam is a major hydroelectric and irrigation dam in central Chile that forms the Rapel Reservoir on the Rapel River.
  • C. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • D. Daivões Dam
    Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
  • E. Polyphyto Dam
    Polyphyto Dam is a major hydroelectric and water management dam in northern Greece, forming Lake Polyphyto on the Aliakmonas River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Salto Dam
Triple: [Lake Salto, createdBy, Salto Dam]
Generated description
Salto Dam is a hydroelectric and water-regulation structure in Italy that impounds Lake Salto, one of the country’s largest artificial lakes.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Salto Dam
Target entity description: Salto Dam is a hydroelectric and water-regulation structure in Italy that impounds Lake Salto, one of the country’s largest artificial lakes.
  • A. Salto Grande Dam
    Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
  • B. Rapel Dam
    Rapel Dam is a major hydroelectric and irrigation dam in central Chile that forms the Rapel Reservoir on the Rapel River.
  • C. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • D. Daivões Dam
    Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
  • E. Polyphyto Dam
    Polyphyto Dam is a major hydroelectric and water management dam in northern Greece, forming Lake Polyphyto on the Aliakmonas River.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8278a06e481908b5d6af0a8afe737 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de61f84f288190877116330bd54393 completed April 14, 2026, 3:49 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd4c29b4e08190896ddde5096628d3 completed May 8, 2026, 2:36 a.m.
NEDg Description generation batch_69fd4d7b9f2c8190ae8367a999a5b0a3 completed May 8, 2026, 2:42 a.m.
NED2 Entity disambiguation (via description) batch_69fd4ddc860881908b8e07c4e3defeaa completed May 8, 2026, 2:43 a.m.
Created at: April 10, 2026, 1:05 a.m.