Triple

T14197336
Position Surface form Disambiguated ID Type / Status
Subject M6 motorway E351870 entity
Predicate hasJunctionWith P1018 FINISHED
Object M54 motorway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M54 motorway | Statement: [M6 motorway, hasJunctionWith, M54 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M54 motorway
Context triple: [M6 motorway, hasJunctionWith, M54 motorway]
  • A. M54 motorway chosen
    The M54 motorway is a key road in the West Midlands of England that links the M6 near Wolverhampton to Telford and provides an important route toward Shropshire and mid-Wales.
  • B. M53 motorway
    The M53 motorway is a major road in north-west England that connects the Wirral Peninsula to the M56 and the wider UK motorway network.
  • C. M4 motorway
    The M4 motorway is a major west–east route in the United Kingdom linking London with South Wales via key cities such as Reading, Swindon, Bristol and Newport.
  • D. M4 motorway
    The M4 motorway is a major Irish motorway that forms part of the primary route linking Dublin with the west of Ireland, including towns such as Leixlip and Mullingar.
  • E. M5 motorway
    The M5 motorway is a major Irish motorway that forms part of the national primary route network, facilitating high-speed road travel and regional connectivity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827894ac0819097803e57f3227b23 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de61e30f208190b61c1c7bd3501156 completed April 14, 2026, 3:48 p.m.
Created at: April 10, 2026, 1:04 a.m.