Triple

T1419497
Position Surface form Disambiguated ID Type / Status
Subject Fréjus Road Tunnel E31991 entity
Predicate instanceOf P0 FINISHED
Object international transport infrastructure C3197 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: international transport infrastructure
Context triple: [Fréjus Road Tunnel, instanceOf, international transport infrastructure]
  • A. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • D. international border crossing chosen
    An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
  • E. road–rail border crossing
    A road–rail border crossing is a designated point at an international boundary where both road and railway transport routes intersect or pass through, enabling the controlled movement of vehicles, trains, goods, and passengers between neighboring countries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49919a994819086528951bc224775 completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 7:59 p.m.