Triple
T1419497
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fréjus Road Tunnel |
E31991
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international transport infrastructure |
C3197
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international transport infrastructure Context triple: [Fréjus Road Tunnel, instanceOf, international transport infrastructure]
-
A.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
B.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
C.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
D.
international border crossing
chosen
An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
-
E.
road–rail border crossing
A road–rail border crossing is a designated point at an international boundary where both road and railway transport routes intersect or pass through, enabling the controlled movement of vehicles, trains, goods, and passengers between neighboring countries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49919a994819086528951bc224775 |
completed | March 1, 2026, 7:52 p.m. |
Created at: March 1, 2026, 7:59 p.m.