Triple

T14193974
Position Surface form Disambiguated ID Type / Status
Subject Meadowbank Lake (impounded section) E351785 entity
Predicate partOfHydroelectricScheme P15311 FINISHED
Object Derwent hydroelectric scheme E351790 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Derwent hydroelectric scheme | Statement: [Meadowbank Lake (impounded section), partOfHydroelectricScheme, Derwent hydroelectric scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Derwent hydroelectric scheme
Context triple: [Meadowbank Lake (impounded section), partOfHydroelectricScheme, Derwent hydroelectric scheme]
  • A. Derwent hydropower scheme chosen
    The Derwent hydropower scheme is a system of hydroelectric power stations and associated infrastructure that harnesses the flow of the River Derwent to generate renewable electricity.
  • B. Tummel hydroelectric scheme
    The Tummel hydroelectric scheme is a major Scottish power project comprising a series of dams, reservoirs, and power stations that harness the waters of the River Tummel and its tributaries to generate electricity.
  • C. Keswick Powerplant
    Keswick Powerplant is a hydroelectric generating facility in California that uses water released from Keswick Dam to produce electricity.
  • D. Rheidol hydroelectric scheme
    The Rheidol hydroelectric scheme is a major hydroelectric power installation in Ceredigion, Wales, harnessing the River Rheidol to generate renewable electricity.
  • E. Tryweryn reservoir scheme
    The Tryweryn reservoir scheme was a controversial mid-20th-century project by Liverpool Corporation to flood the Welsh village of Capel Celyn to create a water supply reservoir, becoming a lasting symbol of Welsh nationalist grievance.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfHydroelectricScheme
Context triple: [Meadowbank Lake (impounded section), partOfHydroelectricScheme, Derwent hydroelectric scheme]
  • A. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • B. isTributaryDamOf
    Indicates that a dam is constructed on and regulates the flow of a tributary river or stream relative to a main watercourse.
  • C. hasHydroelectricProject chosen
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • D. downstreamReservoir
    Indicates that one reservoir is located downstream of, and receives water flow from, another reservoir in a connected water system.
  • E. hydroelectricStationCommissioned
    Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827894ac0819097803e57f3227b23 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de61e0a52081908213aa6e548d4418 completed April 14, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd194951d481909a8e81f2d09feefa completed May 7, 2026, 10:59 p.m.
PD Predicate disambiguation batch_69de05baed64819096590e5618a3a8ed completed April 14, 2026, 9:15 a.m.
Created at: April 10, 2026, 1:04 a.m.