Triple
T14193974
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Meadowbank Lake (impounded section) |
E351785
|
entity |
| Predicate | partOfHydroelectricScheme |
P15311
|
FINISHED |
| Object | Derwent hydroelectric scheme |
E351790
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Derwent hydroelectric scheme | Statement: [Meadowbank Lake (impounded section), partOfHydroelectricScheme, Derwent hydroelectric scheme]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Derwent hydroelectric scheme Context triple: [Meadowbank Lake (impounded section), partOfHydroelectricScheme, Derwent hydroelectric scheme]
-
A.
Derwent hydropower scheme
chosen
The Derwent hydropower scheme is a system of hydroelectric power stations and associated infrastructure that harnesses the flow of the River Derwent to generate renewable electricity.
-
B.
Tummel hydroelectric scheme
The Tummel hydroelectric scheme is a major Scottish power project comprising a series of dams, reservoirs, and power stations that harness the waters of the River Tummel and its tributaries to generate electricity.
-
C.
Keswick Powerplant
Keswick Powerplant is a hydroelectric generating facility in California that uses water released from Keswick Dam to produce electricity.
-
D.
Rheidol hydroelectric scheme
The Rheidol hydroelectric scheme is a major hydroelectric power installation in Ceredigion, Wales, harnessing the River Rheidol to generate renewable electricity.
-
E.
Tryweryn reservoir scheme
The Tryweryn reservoir scheme was a controversial mid-20th-century project by Liverpool Corporation to flood the Welsh village of Capel Celyn to create a water supply reservoir, becoming a lasting symbol of Welsh nationalist grievance.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: partOfHydroelectricScheme Context triple: [Meadowbank Lake (impounded section), partOfHydroelectricScheme, Derwent hydroelectric scheme]
-
A.
isHydroelectricProjectOn
Indicates that a hydroelectric project is located on or situated along a specified water body or site.
-
B.
isTributaryDamOf
Indicates that a dam is constructed on and regulates the flow of a tributary river or stream relative to a main watercourse.
-
C.
hasHydroelectricProject
chosen
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
-
D.
downstreamReservoir
Indicates that one reservoir is located downstream of, and receives water flow from, another reservoir in a connected water system.
-
E.
hydroelectricStationCommissioned
Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d827894ac0819097803e57f3227b23 |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de61e0a52081908213aa6e548d4418 |
completed | April 14, 2026, 3:48 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fd194951d481909a8e81f2d09feefa |
completed | May 7, 2026, 10:59 p.m. |
| PD | Predicate disambiguation | batch_69de05baed64819096590e5618a3a8ed |
completed | April 14, 2026, 9:15 a.m. |
Created at: April 10, 2026, 1:04 a.m.