Triple

T1416566
Position Surface form Disambiguated ID Type / Status
Subject Kelly Clarkson E31930 entity
Predicate album P1995 FINISHED
Object Piece by Piece E161738 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Piece by Piece | Statement: [Kelly Clarkson, album, Piece by Piece]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Piece by Piece
Context triple: [Kelly Clarkson, album, Piece by Piece]
  • A. Piece by Piece chosen
    "Piece by Piece" is a pop ballad by American singer Kelly Clarkson that reflects on themes of abandonment and healing, widely recognized for its emotional live performances and autobiographical lyrics.
  • B. Speak My Piece
    "Speak My Piece" is a track by American rapper Common from his socially conscious 2014 album "Nobody's Smiling."
  • C. Like a Stone
    "Like a Stone" is a melancholic, introspective rock ballad by Audioslave, renowned for Chris Cornell’s haunting vocals and reflective lyrics on mortality and longing.
  • D. A Song
    "A Song" is a track by Greek composer Vangelis featured on his 1979 electronic music album "Earth."
  • E. The Waiting
    "The Waiting" is a popular rock song by Tom Petty and the Heartbreakers, known for its jangly guitars and reflective lyrics about anticipation and patience.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49919a994819086528951bc224775 completed March 1, 2026, 7:52 p.m.
NER Named-entity recognition batch_69a4c403ccdc8190b2a5fda037b6ea34 completed March 1, 2026, 10:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69ad015cdc8881908887aa0fb0838145 completed March 8, 2026, 4:55 a.m.
Created at: March 1, 2026, 7:59 p.m.