Triple
T14163345
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Phoenix Avance |
E351004
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | business landmark |
C20158
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: business landmark Context triple: [Phoenix Avance, instanceOf, business landmark]
-
A.
urban landmark
An urban landmark is a prominent, easily recognizable feature within a city—such as a building, monument, or natural formation—that serves as a visual reference point and symbol of the area’s identity.
-
B.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
C.
man_made_structure
chosen
A man_made_structure is any constructed physical entity or facility created by humans to serve functional, aesthetic, or protective purposes in the built environment.
-
D.
business corridor
A business corridor is a concentrated area along a major route or within a district where commercial, office, and retail activities are clustered to support economic activity and accessibility.
-
E.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278775fc8190b0802d22ca2f495d |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 12:59 a.m.