Triple
T14161728
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hagood Avenue campus |
E350963
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | auxiliary campus |
C6117
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: auxiliary campus Context triple: [Hagood Avenue campus, instanceOf, auxiliary campus]
-
A.
university satellite campus
A university satellite campus is a geographically separate branch of a main university that offers selected academic programs and services to extend access to higher education in a different location.
-
B.
secondary campus
chosen
A secondary campus is a separate physical site or facility that extends the operations, services, or population of a primary institution, such as a school or college, while remaining administratively connected to it.
-
C.
campus
A campus is a defined area of land that houses the buildings, facilities, and open spaces of an educational institution, supporting academic, residential, and social activities.
-
D.
primary campus
The primary campus is the main physical location of an educational institution where core academic, administrative, and student life activities are centralized.
-
E.
campus vicinity
The campus vicinity is the surrounding area adjacent to a campus that includes nearby streets, businesses, residences, and public spaces commonly used by campus members.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8278775fc8190b0802d22ca2f495d |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 12:59 a.m.