Triple

T14146460
Position Surface form Disambiguated ID Type / Status
Subject Central Station E350561 entity
Predicate alsoKnownAs P39 FINISHED
Object Central do Brasil E854150 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central do Brasil | Statement: [Central Station, alsoKnownAs, Central do Brasil]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central do Brasil
Context triple: [Central Station, alsoKnownAs, Central do Brasil]
  • A. E.F.C.B. (Estrada de Ferro Central do Brasil)
    E.F.C.B. (Estrada de Ferro Central do Brasil) is a painting by Brazilian modernist artist Tarsila do Amaral that reflects her distinctive style and engagement with Brazil’s industrial and cultural landscape.
  • B. Intercidades
    Intercidades is Portugal’s main long-distance intercity train service operated by the national railway company, connecting major cities across the country.
  • C. SuperVia chosen
    SuperVia is the main commuter rail operator serving the metropolitan region of Rio de Janeiro, Brazil.
  • D. Rio de Janeiro–Belo Horizonte corridor
    The Rio de Janeiro–Belo Horizonte corridor is a major Brazilian transport and economic axis linking the cities of Rio de Janeiro and Belo Horizonte through a network of highways and railways.
  • E. North–South Corridor of São Paulo
    The North–South Corridor of São Paulo is a major urban expressway system that channels high-capacity traffic flow through the city in a north–south direction, connecting key avenues and districts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827865f608190b311820428ae027b completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de612266248190a8591b646fe30ae6 completed April 14, 2026, 3:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69fcdf1d8c448190bd223258b28fecc9 completed May 7, 2026, 6:51 p.m.
Created at: April 10, 2026, 12:54 a.m.