Triple
T14142688
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cardiff city centre road network |
E350464
|
entity |
| Predicate | connectedToRoad |
P12245
|
FINISHED |
| Object |
A4161
The A4161 is a key urban road in Cardiff, Wales, forming part of the main traffic route through the city centre.
|
E1082841
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A4161 | Statement: [Cardiff city centre road network, connectedToRoad, A4161]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: A4161 Context triple: [Cardiff city centre road network, connectedToRoad, A4161]
-
A.
A41
The A41 is a major road in England that runs between London and Birkenhead, serving as an important route through the Midlands and Home Counties.
-
B.
A417
A417 is a major road in England that links key towns and routes in Gloucestershire and the surrounding region.
-
C.
A414
The A414 is a major east–west road in southern England that links several Hertfordshire towns and provides an important route near Welwyn Garden City.
-
D.
A419
The A419 is a major road in England that links Swindon with Gloucester, serving as an important regional route in the southwest.
-
E.
A418
The A418 is a primary road in England that connects the town of Thame with other nearby settlements and major routes in the region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A4161 Triple: [Cardiff city centre road network, connectedToRoad, A4161]
Generated description
The A4161 is a key urban road in Cardiff, Wales, forming part of the main traffic route through the city centre.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: A4161 Target entity description: The A4161 is a key urban road in Cardiff, Wales, forming part of the main traffic route through the city centre.
-
A.
A41
The A41 is a major road in England that runs between London and Birkenhead, serving as an important route through the Midlands and Home Counties.
-
B.
A417
A417 is a major road in England that links key towns and routes in Gloucestershire and the surrounding region.
-
C.
A414
The A414 is a major east–west road in southern England that links several Hertfordshire towns and provides an important route near Welwyn Garden City.
-
D.
A419
The A419 is a major road in England that links Swindon with Gloucester, serving as an important regional route in the southwest.
-
E.
A418
The A418 is a primary road in England that connects the town of Thame with other nearby settlements and major routes in the region.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d827865f608190b311820428ae027b |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de611ed3508190add37baa30d1d134 |
completed | April 14, 2026, 3:45 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fcdf18e3d08190b287e2da192d05eb |
completed | May 7, 2026, 6:51 p.m. |
| NEDg | Description generation | batch_69fce1a2a4c881908d18b45917286712 |
completed | May 7, 2026, 7:01 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69fce24e7860819097f51a4907c894a7 |
completed | May 7, 2026, 7:04 p.m. |
Created at: April 10, 2026, 12:51 a.m.