Triple
T1412263
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Agenda 2063 |
E31829
|
entity |
| Predicate | hasFlagshipProject |
P14971
|
FINISHED |
| Object |
Grand Inga Dam Project
The Grand Inga Dam Project is an ambitious proposed hydroelectric megaproject on the Congo River in the Democratic Republic of the Congo, intended to become the world’s largest power station and a key driver of regional energy integration and development.
|
E162068
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Grand Inga Dam Project | Statement: [Agenda 2063, hasFlagshipProject, Grand Inga Dam Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Grand Inga Dam Project Context triple: [Agenda 2063, hasFlagshipProject, Grand Inga Dam Project]
-
A.
Aswan High Dam
The Aswan High Dam is a massive embankment dam on the Nile River in southern Egypt, built in the 1960s to control flooding, provide hydroelectric power, and improve irrigation, while also causing the creation of Lake Nasser and the displacement of communities and archaeological sites in Nubia.
-
B.
Cahora Bassa Dam
Cahora Bassa Dam is a major hydroelectric dam in Mozambique that forms one of Africa’s largest artificial lakes and supplies significant power to the region.
-
C.
Kainji Dam
Kainji Dam is a major hydroelectric power and irrigation dam in Nigeria, forming Lake Kainji and serving as a key source of electricity and water management in the region.
-
D.
Kosi Barrage
Kosi Barrage is a major flood-control and irrigation structure built across the Kosi River near the India–Nepal border.
-
E.
Jebba Dam
Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Grand Inga Dam Project Triple: [Agenda 2063, hasFlagshipProject, Grand Inga Dam Project]
Generated description
The Grand Inga Dam Project is an ambitious proposed hydroelectric megaproject on the Congo River in the Democratic Republic of the Congo, intended to become the world’s largest power station and a key driver of regional energy integration and development.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Grand Inga Dam Project Target entity description: The Grand Inga Dam Project is an ambitious proposed hydroelectric megaproject on the Congo River in the Democratic Republic of the Congo, intended to become the world’s largest power station and a key driver of regional energy integration and development.
-
A.
Aswan High Dam
The Aswan High Dam is a massive embankment dam on the Nile River in southern Egypt, built in the 1960s to control flooding, provide hydroelectric power, and improve irrigation, while also causing the creation of Lake Nasser and the displacement of communities and archaeological sites in Nubia.
-
B.
Cahora Bassa Dam
Cahora Bassa Dam is a major hydroelectric dam in Mozambique that forms one of Africa’s largest artificial lakes and supplies significant power to the region.
-
C.
Kainji Dam
Kainji Dam is a major hydroelectric power and irrigation dam in Nigeria, forming Lake Kainji and serving as a key source of electricity and water management in the region.
-
D.
Kosi Barrage
Kosi Barrage is a major flood-control and irrigation structure built across the Kosi River near the India–Nepal border.
-
E.
Jebba Dam
Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49919a994819086528951bc224775 |
completed | March 1, 2026, 7:52 p.m. |
| NER | Named-entity recognition | batch_69a4c48ff58c8190aeaf09d3e7cad7c7 |
completed | March 1, 2026, 10:58 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ace57ec2d88190b06d0f20e3b52462 |
completed | March 8, 2026, 2:57 a.m. |
| NEDg | Description generation | batch_69ace5fc91d081909b33009d06a38616 |
completed | March 8, 2026, 2:59 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ace6c10f54819089a4afcf49ef894f |
completed | March 8, 2026, 3:02 a.m. |
Created at: March 1, 2026, 7:59 p.m.