Triple

T1412223
Position Surface form Disambiguated ID Type / Status
Subject Agenda 2063 E31829 entity
Predicate instanceOf P0 FINISHED
Object long-term plan C7550 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: long-term plan
Context triple: [Agenda 2063, instanceOf, long-term plan]
  • A. planning library
    A planning library is a reusable collection of algorithms, data structures, and tools that support the creation, evaluation, and optimization of plans or schedules within software applications.
  • B. multiannual funding programme
    A multiannual funding programme is a structured financial initiative that allocates resources over several years to support specified objectives, projects, or policy priorities within a defined framework and timeline.
  • C. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • D. partition plan
    A partition plan is a detailed layout or strategy that defines how a space, dataset, or resource is divided into distinct sections or segments according to specific criteria or requirements.
  • E. period of preparation
    A period of preparation is a span of time intentionally set aside to gather resources, build skills, and organize plans in advance of a forthcoming event or undertaking.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49919a994819086528951bc224775 completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 7:59 p.m.