Triple

T1411843
Position Surface form Disambiguated ID Type / Status
Subject African Central Bank E31821 entity
Predicate instanceOf P0 FINISHED
Object planned supranational central bank C3806 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned supranational central bank
Context triple: [African Central Bank, instanceOf, planned supranational central bank]
  • A. economic and monetary union
    An economic and monetary union is an integration arrangement in which participating countries coordinate economic policies, remove barriers to trade and capital movement, and adopt a common currency managed by a shared central monetary authority.
  • B. supranational entity chosen
    A supranational entity is an organization or institution formed by multiple sovereign states that delegates certain decision-making powers above the national level to pursue common policies or goals.
  • C. centralized economic planning system
    A centralized economic planning system is a structure in which a central authority makes decisions about the allocation of resources, production targets, and distribution of goods and services across an economy.
  • D. monetary system
    A monetary system is the structured framework of institutions, rules, instruments, and practices a society uses to create, manage, and exchange money as a medium of value.
  • E. international monetary system
    The international monetary system is the set of rules, institutions, and arrangements that govern how countries manage exchange rates, conduct cross-border payments, and coordinate their monetary and financial relations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49919a994819086528951bc224775 completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 7:59 p.m.