Triple

T14100701
Position Surface form Disambiguated ID Type / Status
Subject Øresund Line E339371 entity
Predicate usesStructure P3097 FINISHED
Object Drogden Tunnel E787186 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Drogden Tunnel | Statement: [Øresund Line, usesStructure, Drogden Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Drogden Tunnel
Context triple: [Øresund Line, usesStructure, Drogden Tunnel]
  • A. Drogden Tunnel chosen
    The Drogden Tunnel is an underwater road and rail tunnel beneath the Øresund Strait that forms the submerged section of the fixed link between Denmark and Sweden.
  • B. Lærdal Tunnel
    The Lærdal Tunnel is a 24.5-kilometer road tunnel in Norway, renowned as one of the world's longest road tunnels and a key link between Oslo and Bergen.
  • C. Ryfylke Tunnel
    The Ryfylke Tunnel is a subsea road tunnel in southwestern Norway that ranks among the world’s longest and deepest undersea tunnels, connecting Stavanger with the Ryfylke region.
  • D. Oslo Tunnel
    The Oslo Tunnel is a central railway tunnel in Oslo, Norway, that carries most of the city's mainline train traffic between its principal stations.
  • E. Tromsøysund Tunnel
    Tromsøysund Tunnel is an undersea road tunnel in northern Norway that connects the island city of Tromsø to the mainland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c69b5c8819094aa1abf18302908 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de5fba7c10819095b1299b7b4f0310 completed April 14, 2026, 3:39 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd193332308190870c4ec7c9753202 completed May 7, 2026, 10:58 p.m.
Created at: April 9, 2026, 10:22 p.m.