Triple

T14095409
Position Surface form Disambiguated ID Type / Status
Subject European Centre for Medium-Range Weather Forecasts E339239 entity
Predicate computingInfrastructure P97553 FINISHED
Object high-performance computing facility LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: high-performance computing facility | Statement: [European Centre for Medium-Range Weather Forecasts, computingInfrastructure, high-performance computing facility]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: computingInfrastructure
Context triple: [European Centre for Medium-Range Weather Forecasts, computingInfrastructure, high-performance computing facility]
  • A. computingModel
    Indicates the computational framework, paradigm, or formal system used to perform or describe a computation.
  • B. computingCenter chosen
    Indicates that an entity functions as or is associated with a computing center, i.e., a facility or unit where computing resources and services are provided or managed.
  • C. computes
    Indicates that one entity performs a calculation or processing operation to produce a result from given data or inputs.
  • D. computerSystem
    Indicates a relationship where an entity functions as or is classified as a computer system, typically comprising hardware, software, and related components that operate together.
  • E. parallelInfrastructure
    Indicates that two or more infrastructure elements are arranged or operate in parallel to each other, typically serving similar functions simultaneously.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c69b5c8819094aa1abf18302908 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de5fb7fb3c819083266dbe7e93aaff completed April 14, 2026, 3:39 p.m.
PD Predicate disambiguation batch_69de05b0e6c88190a819eeba0028981f completed April 14, 2026, 9:15 a.m.
Created at: April 9, 2026, 10:22 p.m.