Triple

T14087734
Position Surface form Disambiguated ID Type / Status
Subject State Route 260 E339040 entity
Predicate connectsTo P845 FINISHED
Object State Route 87 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Route 87 | Statement: [State Route 260, connectsTo, State Route 87]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Route 87
Context triple: [State Route 260, connectsTo, State Route 87]
  • A. State Route 87 chosen
    State Route 87 is a north–south state highway in San Jose, California, running along the Guadalupe River and connecting U.S. Route 101 with Interstate 280 and other major freeways.
  • B. State Route 88
    State Route 88 is a Nevada state highway that serves as a key connector route in the western part of the state, linking local communities to regional transportation corridors.
  • C. State Route 88
    State Route 88 is a California state highway that runs from the Central Valley into the Sierra Nevada, serving as a key east–west route over the mountains.
  • D. State Route 85
    State Route 85 is a major north–south freeway in California’s Silicon Valley that connects the cities of the South Bay while bypassing central San Jose.
  • E. State Route 85
    State Route 85 is a major north–south highway in Arizona that connects the Phoenix metropolitan area to Interstate 8 and serves as an important route toward Mexico and the southwestern part of the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c687b0c819087fd9ed4198403f8 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de5ee1ce88819091c983286289337e completed April 14, 2026, 3:36 p.m.
Created at: April 9, 2026, 10:21 p.m.