Triple

T14061241
Position Surface form Disambiguated ID Type / Status
Subject CRH E338350 entity
Predicate brandingAppliesTo P6644 FINISHED
Object CRH380D trainsets E792393 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CRH380D trainsets | Statement: [CRH, brandingAppliesTo, CRH380D trainsets]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CRH380D trainsets
Context triple: [CRH, brandingAppliesTo, CRH380D trainsets]
  • A. CRH380D chosen
    The CRH380D is a high-speed electric multiple unit train used in China, designed for rapid intercity passenger service at speeds of up to around 380 km/h.
  • B. CRH3 EMU
    The CRH3 EMU is a high-speed electric multiple unit train used in China’s railway network, derived from Siemens Velaro technology and designed for operation at speeds up to around 350 km/h.
  • C. CRH380A EMU
    The CRH380A EMU is a high-speed electric multiple unit train used in China’s railway network, designed for rapid intercity passenger service at speeds of up to around 380 km/h.
  • D. CRH380B
    The CRH380B is a high-speed electric multiple unit train used in China’s railway network, designed for rapid intercity passenger service at speeds up to around 380 km/h.
  • E. CRH380C
    The CRH380C is a high-speed electric multiple unit train used in China’s railway network, designed for rapid passenger service at speeds of up to around 380 km/h.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c67ba6c819091935650dfb3b895 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de568876308190840361dcaf10bd45 completed April 14, 2026, 3 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd27fdad4c8190bf5ce5d676284e62 completed May 8, 2026, 12:02 a.m.
Created at: April 9, 2026, 10:21 p.m.