Triple

T14058306
Position Surface form Disambiguated ID Type / Status
Subject Snowy–Tumut Development E338275 entity
Predicate partOf P40 FINISHED
Object Murray–Darling Basin water management system E957938 NE FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Murray–Darling Basin water management system
Context triple: [Snowy–Tumut Development, partOf, Murray–Darling Basin water management system]
  • A. Murray–Darling Basin water management system chosen
    The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
  • B. Murrumbidgee Irrigation Area
    The Murrumbidgee Irrigation Area is a major agricultural region in New South Wales, Australia, renowned for its extensive irrigation schemes that support fruit, rice, and other crop production.
  • C. Murray–Darling Basin wetland network
    The Murray–Darling Basin wetland network is an interconnected system of ecologically significant wetlands across southeastern Australia that supports rich biodiversity and plays a crucial role in regional water regulation and habitat conservation.
  • D. Murray River lock and weir system
    The Murray River lock and weir system is a network of engineered structures along Australia’s longest river designed to regulate water levels, support navigation, and manage irrigation and environmental flows.
  • E. Goulburn–Murray Irrigation District
    Goulburn–Murray Irrigation District is a major agricultural irrigation region in northern Victoria, Australia, supplying water to extensive dairy, horticulture, and mixed farming enterprises.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

Stage Batch ID Job type Status
creating batch_69d81c67ba6c819091935650dfb3b895 elicitation completed
NER batch_69de3c8e6d008190af8892f34c5cefbd ner completed
NED1 batch_69fcb662c37c8190a629278a97060080 ned_source_triple completed
Created at: April 9, 2026, 10:20 p.m.