Triple

T14058294
Position Surface form Disambiguated ID Type / Status
Subject Snowy–Tumut Development E338275 entity
Predicate hasComponent P35 FINISHED
Object Tumut Two Dam E1081104 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tumut Two Dam | Statement: [Snowy–Tumut Development, hasComponent, Tumut Two Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tumut Two Dam
Context triple: [Snowy–Tumut Development, hasComponent, Tumut Two Dam]
  • A. Mutirikwi Dam
    Mutirikwi Dam is a major concrete arch dam in southeastern Zimbabwe that creates Lake Mutirikwi and serves as an important source of irrigation water and hydroelectric power.
  • B. Tantangara Dam
    Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
  • C. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • D. Tumut Pond Dam chosen
    Tumut Pond Dam is a major concrete arch dam in New South Wales, Australia, forming part of the Snowy Mountains Scheme’s hydroelectric power and water management system.
  • E. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c67ba6c819091935650dfb3b895 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de3c8e6d008190af8892f34c5cefbd completed April 14, 2026, 1:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69fcf7da9414819094d81e5a6ac9fbf9 completed May 7, 2026, 8:36 p.m.
Created at: April 9, 2026, 10:20 p.m.