Triple

T14058278
Position Surface form Disambiguated ID Type / Status
Subject Snowy–Tumut Development E338275 entity
Predicate instanceOf P0 FINISHED
Object water diversion scheme C2937 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water diversion scheme
Context triple: [Snowy–Tumut Development, instanceOf, water diversion scheme]
  • A. water transfer project chosen
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • B. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. diversion dam
    A diversion dam is a low barrier built across a river or stream to redirect water into canals, pipelines, or other conveyance systems for irrigation, municipal use, or hydropower, rather than for large-scale storage.
  • D. water supply dam
    A water supply dam is a barrier constructed across a watercourse to store and regulate water primarily for human consumption, irrigation, and other municipal or industrial uses.
  • E. irrigation dam
    An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c67ba6c819091935650dfb3b895 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:20 p.m.