Triple

T14058209
Position Surface form Disambiguated ID Type / Status
Subject Tumut 1 Power Station E338273 entity
Predicate operator P179 FINISHED
Object Snowy Hydro Limited E370985 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy Hydro Limited | Statement: [Tumut 1 Power Station, operator, Snowy Hydro Limited]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Snowy Hydro Limited
Context triple: [Tumut 1 Power Station, operator, Snowy Hydro Limited]
  • A. Snowy Hydro Limited chosen
    Snowy Hydro Limited is an Australian electricity generation and retail company that operates the Snowy Mountains Hydroelectric Scheme and other energy assets.
  • B. Snowy Hydro Scheme
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • C. Murrumbidgee Irrigation Limited
    Murrumbidgee Irrigation Limited is an Australian company responsible for managing and operating irrigation infrastructure and water delivery services in the Murrumbidgee region of New South Wales.
  • D. Meridian Energy
    Meridian Energy is a major New Zealand electricity generator and retailer, known for its extensive portfolio of renewable energy assets including large hydroelectric power stations.
  • E. Canadian Hydro Developers
    Canadian Hydro Developers was a Canadian renewable energy company focused on developing and operating wind, hydro, and other clean power projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c67ba6c819091935650dfb3b895 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de3c8e6d008190af8892f34c5cefbd completed April 14, 2026, 1:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69fcdefaabd0819098870522a6ce850c completed May 7, 2026, 6:50 p.m.
Created at: April 9, 2026, 10:20 p.m.