Triple
T14041433
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sharad Purnima |
E337856
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | full moon festival |
C3223
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: full moon festival Context triple: [Sharad Purnima, instanceOf, full moon festival]
-
A.
harvest festival
A harvest festival is a communal celebration held at the end of the growing season to give thanks for and enjoy the gathered crops through feasting, rituals, and cultural traditions.
-
B.
moon god
A moon god is a deity associated with the moon, often governing its cycles, light, and symbolic influences on nature, time, and human fate.
-
C.
lunisolar calendar
A lunisolar calendar is a dating system that combines lunar months with periodic adjustments to align with the solar year, ensuring that months track the moon’s phases while years remain synchronized with the seasons.
-
D.
inner moon
An inner moon is a natural satellite that orbits very close to its parent planet, typically within the planet’s main ring system or just inside it, and is strongly influenced by the planet’s gravity and radiation environment.
-
E.
festival
chosen
A festival is a planned, often recurring event where a community gathers to celebrate cultural, religious, seasonal, or thematic traditions through shared activities, performances, and rituals.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c664e48819088cbd8f433aeffe5 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:20 p.m.