Triple
T14032628
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | nEUROn UCAV demonstrator |
E337630
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stealth aircraft prototype |
C6075
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stealth aircraft prototype Context triple: [nEUROn UCAV demonstrator, instanceOf, stealth aircraft prototype]
-
A.
nuclear-powered aircraft prototype
A nuclear-powered aircraft prototype is an experimental aircraft design that uses a nuclear reactor as its primary energy source to generate thrust or power propulsion systems, aiming for extremely long endurance without refueling.
-
B.
unbuilt aircraft project
An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
-
C.
jet-powered hydroplane
A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
-
D.
X-plane
An X-plane is an experimental aircraft designed to test and demonstrate new aviation technologies, configurations, or performance capabilities beyond those of conventional aircraft.
-
E.
experimental aircraft
chosen
An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c6543a48190bd5ba93d7419e797 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:20 p.m.