Triple

T14028897
Position Surface form Disambiguated ID Type / Status
Subject Maryland Route 223 E337533 entity
Predicate hasRouteDesignation P5539 FINISHED
Object MD 223 E1074854 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MD 223 | Statement: [Maryland Route 223, hasRouteDesignation, MD 223]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MD 223
Context triple: [Maryland Route 223, hasRouteDesignation, MD 223]
  • A. MD 223 chosen
    MD 223 is a state highway in Maryland that serves as a connector route through Prince George's County, linking several local communities and major roads.
  • B. MD 22
    MD 22 is a state highway in Maryland that runs through Harford County, connecting the city of Aberdeen and the Aberdeen Proving Ground area with U.S. Route 1 and other regional routes.
  • C. MD 212
    MD 212 is a Maryland state highway serving as a key east–west arterial route in the Washington, D.C. metropolitan area, connecting communities in Prince George’s and Montgomery counties.
  • D. MD 322
    MD 322 is a short state highway in Maryland that serves as a connector route in the Easton area.
  • E. MD 202
    MD 202 is a state highway in Maryland that connects communities in Prince George’s County, including the area near FedExField and the Capital Beltway.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c6543a48190bd5ba93d7419e797 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de2fa9f8248190930954d609dee5f1 completed April 14, 2026, 12:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69fcb657ab348190ab51ec0e8caa2c4f completed May 7, 2026, 3:57 p.m.
Created at: April 9, 2026, 10:20 p.m.