Triple
T14023169
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 空母「赤城」 |
E337386
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 航空母艦 |
C5299
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 航空母艦 Context triple: [空母「赤城」, instanceOf, 航空母艦]
-
A.
seaplane carrier
A seaplane carrier is a naval vessel designed to transport, launch, recover, and support seaplanes for reconnaissance, patrol, and other maritime aviation operations.
-
B.
missile carrier
A missile carrier is a vehicle or platform designed to transport, launch, and sometimes guide missiles toward designated targets.
-
C.
aircraft carrier class
chosen
An aircraft carrier class is a conceptual category representing a group of aircraft carriers sharing a common design, capabilities, and intended operational role within a navy.
-
D.
Unryū-class aircraft carrier
The Unryū-class aircraft carrier was a World War II-era Japanese Imperial Navy fleet carrier design intended as a simplified, faster-to-build successor to the Hiryū, optimized for rapid construction and air group operations in the later stages of the Pacific War.
-
E.
nuclear-powered aircraft carrier
A nuclear-powered aircraft carrier is a massive naval warship that uses nuclear reactors for propulsion and power, enabling it to launch, recover, and support aircraft operations over long durations without frequent refueling.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c6543a48190bd5ba93d7419e797 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:19 p.m.