Triple

T14017048
Position Surface form Disambiguated ID Type / Status
Subject Johannesburg drainage system E337230 entity
Predicate instanceOf P0 FINISHED
Object urban drainage system C27395 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban drainage system
Context triple: [Johannesburg drainage system, instanceOf, urban drainage system]
  • A. urban watercourse
    An urban watercourse is a natural or engineered channel of flowing water that runs through a city or town, shaped and managed by surrounding urban infrastructure and land use.
  • B. water infrastructure chosen
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • C. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • D. drainage channel
    A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
  • E. sewer utility
    A sewer utility is an organization or system responsible for collecting, transporting, treating, and safely disposing of wastewater and sewage from homes, businesses, and industries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c6543a48190bd5ba93d7419e797 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:19 p.m.