Triple

T13999881
Position Surface form Disambiguated ID Type / Status
Subject Central Workshop E336793 entity
Predicate instanceOf P0 FINISHED
Object engineering workshop C32248 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering workshop
Context triple: [Central Workshop, instanceOf, engineering workshop]
  • A. engineering process
    An engineering process is a structured, iterative sequence of activities and decisions used to design, develop, test, and maintain systems or products to meet specified requirements efficiently and reliably.
  • B. engineering division
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • C. engineering institute
    An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
  • D. workshop
    A workshop is a structured, often interactive session or series of sessions where participants engage in hands-on activities and guided instruction to develop specific skills or knowledge.
  • E. engineering education centre chosen
    An engineering education centre is a dedicated facility that supports the teaching, learning, and practical application of engineering principles through classrooms, laboratories, workshops, and collaborative spaces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c645c5c8190b1fd16a285a1b78a completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:19 p.m.