Triple

T13988006
Position Surface form Disambiguated ID Type / Status
Subject Derivation by Phase E336491 entity
Predicate instanceOf P0 FINISHED
Object work in the Minimalist Program C34455 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: work in the Minimalist Program
Context triple: [Derivation by Phase, instanceOf, work in the Minimalist Program]
  • A. programme of work
    A programme of work is a structured, time-bound collection of related tasks and activities organized to achieve specific objectives or deliver defined outcomes.
  • B. public art program
    A public art program is an organized initiative, typically led by a government or institution, that commissions, funds, and manages artworks in public spaces to enhance community identity, cultural expression, and shared environments.
  • C. ACM program
    An ACM program is a software application or system developed, evaluated, or used within the context of the Association for Computing Machinery’s computing, research, and educational activities.
  • D. program
    A program is a structured set of instructions written in a programming language that a computer can execute to perform specific tasks or solve problems.
  • E. library building program
    A library building program is an organized initiative that plans, funds, designs, and constructs or renovates library facilities to meet community information, learning, and cultural needs.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c639e808190a0e4b4f3d31c6a59 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:18 p.m.