Triple

T13984060
Position Surface form Disambiguated ID Type / Status
Subject St. Clair Tunnel E336387 entity
Predicate instanceOf P0 FINISHED
Object cross-border transportation infrastructure C9303 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-border transportation infrastructure
Context triple: [St. Clair Tunnel, instanceOf, cross-border transportation infrastructure]
  • A. cross-border transport link chosen
    A cross-border transport link is an infrastructure connection—such as a road, railway, bridge, tunnel, or ferry route—that enables the movement of people and goods between two or more countries.
  • B. road–rail border crossing
    A road–rail border crossing is a designated point at an international boundary where both road and railway transport routes intersect or pass through, enabling the controlled movement of vehicles, trains, goods, and passengers between neighboring countries.
  • C. transport infrastructure agreement
    A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
  • D. international border crossing
    An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
  • E. border crossings network
    A border crossings network is a connected system of official entry and exit points, routes, and control infrastructures that manage and facilitate the movement of people, goods, and vehicles between neighboring jurisdictions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c639e808190a0e4b4f3d31c6a59 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:18 p.m.