Triple
T13983506
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Eastbank Esplanade |
E336374
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian and bicycle pathway |
C30362
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pedestrian and bicycle pathway Context triple: [Eastbank Esplanade, instanceOf, pedestrian and bicycle pathway]
-
A.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
B.
rail trail
A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
-
C.
waterfront greenway
chosen
A waterfront greenway is a linear, publicly accessible open space along a body of water that combines pedestrian and bicycle paths with landscaping, recreation areas, and ecological features to connect communities and enhance shoreline environments.
-
D.
parkway
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
-
E.
pedestrian network
A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c639e808190a0e4b4f3d31c6a59 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:18 p.m.