Triple

T13968098
Position Surface form Disambiguated ID Type / Status
Subject New Ellenton, South Carolina E335978 entity
Predicate near P350 FINISHED
Object Savannah River Site E18199 NE FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Savannah River Site
Context triple: [New Ellenton, South Carolina, near, Savannah River Site]
  • A. Savannah River Site chosen
    Savannah River Site is a U.S. Department of Energy nuclear reservation in South Carolina historically used for producing materials for nuclear weapons and now focused on environmental cleanup and nuclear materials management.
  • B. Savannah River National Laboratory
    Savannah River National Laboratory is a U.S. Department of Energy research facility in South Carolina specializing in nuclear materials management, environmental remediation, and national security technologies.
  • C. Oak Ridge Reservation
    Oak Ridge Reservation is a large U.S. Department of Energy site in Oak Ridge, Tennessee, historically central to the Manhattan Project and now a major center for nuclear research, environmental management, and national security work.
  • D. Oak Ridge Gaseous Diffusion Plant
    The Oak Ridge Gaseous Diffusion Plant was a major U.S. uranium enrichment facility in Oak Ridge, Tennessee, built during the Manhattan Project and later used for Cold War nuclear fuel production.
  • E. Hanford Site, Washington
    Hanford Site, Washington is a large decommissioned nuclear production complex along the Columbia River that was central to U.S. plutonium production during and after World War II and is now one of the nation’s most challenging environmental cleanup sites.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

Stage Batch ID Job type Status
creating batch_69d81c61f3508190aaf2ca0dc0002c59 elicitation completed
NER batch_69de2e8c9e988190a84c9ca8a78b515f ner completed
NED1 batch_69fba1da70588190a6c9a3895d92be5b ned_source_triple completed
Created at: April 9, 2026, 10:18 p.m.