Triple
T13955179
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kasukabe Depot |
E335637
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway rolling stock storage facility |
C23629
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway rolling stock storage facility Context triple: [Kasukabe Depot, instanceOf, railway rolling stock storage facility]
-
A.
rolling stock storage facility
chosen
A rolling stock storage facility is a dedicated area or building where railway vehicles such as locomotives and carriages are parked, secured, and sometimes lightly serviced when not in operation.
-
B.
former railway facility
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
-
C.
railroad depot
A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
-
D.
rolling stock
Rolling stock refers to all the vehicles that move on a railway, including locomotives, passenger coaches, freight wagons, and maintenance units.
-
E.
rolling stock maintenance company
A rolling stock maintenance company is an organization that inspects, services, repairs, and overhauls railway vehicles such as locomotives, passenger coaches, and freight wagons to ensure their safety, reliability, and regulatory compliance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c6081b88190b53e317c3370c8fe |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:17 p.m.