Triple

T13955140
Position Surface form Disambiguated ID Type / Status
Subject Oshiage Station E335636 entity
Predicate operator P179 FINISHED
Object Tobu Railway E185891 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tobu Railway | Statement: [Oshiage Station, operator, Tobu Railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tobu Railway
Context triple: [Oshiage Station, operator, Tobu Railway]
  • A. Tobu Railway chosen
    Tobu Railway is a major private railway company in Japan that operates extensive rail networks in the Greater Tokyo area and surrounding regions.
  • B. Seibu Railway
    Seibu Railway is a major private railway operator in the Greater Tokyo area of Japan, running extensive commuter and interurban train services across Tokyo and Saitama.
  • C. Tokyu Railways
    Tokyu Railways is a major private railway operator in the Greater Tokyo area of Japan, known for its extensive commuter rail network and integration with urban development projects.
  • D. Keisei Electric Railway
    Keisei Electric Railway is a major private railway operator in the Greater Tokyo area, best known for linking central Tokyo with Chiba Prefecture and Narita International Airport.
  • E. Tokyu Toyoko Line
    The Tokyu Toyoko Line is a major private railway line in the Tokyo–Yokohama area that connects central Tokyo with Yokohama and links to multiple subway and intercity rail services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c6081b88190b53e317c3370c8fe completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de2e78a4a481908e438745631a43c0 completed April 14, 2026, 12:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd466d5f1c81909accae028184b857 completed May 8, 2026, 2:11 a.m.
Created at: April 9, 2026, 10:17 p.m.