Triple

T13934143
Position Surface form Disambiguated ID Type / Status
Subject Chuck Glover E335068 entity
Predicate basedOnRealWorldEntity P106938 FINISHED
Object Tennessee Valley Authority dam projects E136 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tennessee Valley Authority dam projects | Statement: [Chuck Glover, basedOnRealWorldEntity, Tennessee Valley Authority dam projects]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tennessee Valley Authority dam projects
Context triple: [Chuck Glover, basedOnRealWorldEntity, Tennessee Valley Authority dam projects]
  • A. Tennessee Valley Authority Norris Dam project
    The Tennessee Valley Authority Norris Dam project was a major New Deal-era hydroelectric and flood-control initiative on the Clinch River in Tennessee that created Norris Dam, Norris Lake, and surrounding recreational and conservation areas.
  • B. Tellico Dam project
    The Tellico Dam project was a controversial Tennessee Valley Authority initiative on the Little Tennessee River, widely known for its environmental and cultural impacts, including the flooding of historic Cherokee sites and a landmark legal battle over the endangered snail darter.
  • C. Yazoo Backwater Project
    The Yazoo Backwater Project is a long-debated U.S. Army Corps of Engineers flood-control initiative in Mississippi’s Yazoo River basin, best known for its controversial proposed pumping station and its environmental and political disputes.
  • D. Tennessee Valley Authority chosen
    The Tennessee Valley Authority is a federally owned U.S. corporation created during the New Deal to provide regional economic development, flood control, and electricity generation in the Tennessee Valley.
  • E. United States federal water projects
    United States federal water projects are large-scale, government-funded initiatives that manage and distribute water resources across the country for purposes such as irrigation, flood control, hydroelectric power, and municipal supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: basedOnRealWorldEntity
Context triple: [Chuck Glover, basedOnRealWorldEntity, Tennessee Valley Authority dam projects]
  • A. basedOnRealRegion
    Indicates that something is derived from, inspired by, or corresponds to an actual geographic or administrative region in the real world.
  • B. influencedByRealWorldConcept
    Indicates that something is shaped, inspired, or determined by an existing concept, phenomenon, or principle from the real world.
  • C. basedOnRealLife
    Indicates that something is derived from, inspired by, or directly adapted from actual real-world events, people, or situations.
  • D. hasRealWorldOrigin chosen
    Indicates that something is derived from, based on, or directly connected to an actual entity, event, or source in the real world.
  • E. temporalRelationToRealWorld
    Indicates a temporal relationship between an event or state and real-world time, such as when it occurs, starts, ends, or overlaps with actual calendar or clock time.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5f739081908bc05b2461f54828 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de2cf28df081908d897d7b9ec7939d completed April 14, 2026, 12:02 p.m.
NED1 Entity disambiguation (via context triple) batch_69f7ce865ab4819088221189344b3801 completed May 3, 2026, 10:39 p.m.
PD Predicate disambiguation batch_69dbc873052c8190b33ff7f7c5a4e7ee completed April 12, 2026, 4:29 p.m.
Created at: April 9, 2026, 10:17 p.m.