Triple
T13933748
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chernobyl Nuclear Power Plant |
E335055
|
entity |
| Predicate | reactor3ShutdownDate |
P92642
|
FINISHED |
| Object | 2000 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2000 | Statement: [Chernobyl Nuclear Power Plant, reactor3ShutdownDate, 2000]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: reactor3ShutdownDate Context triple: [Chernobyl Nuclear Power Plant, reactor3ShutdownDate, 2000]
-
A.
finalShutdownDate
chosen
Indicates the date on which an entity is permanently shut down or ceases operation.
-
B.
reactor
Indicates a relationship where an entity functions as or is associated with a nuclear or chemical reactor system.
-
C.
reactor3Commissioned
Indicates that the third reactor in a series or facility has been officially placed into service or begun operation.
-
D.
PM-3AReactorOperationalUntil
Indicates that a specific PM-3A reactor remained in an operational state up to a given point in time.
-
E.
reactor3StatusDuringAccident
Indicates the operational or physical condition of reactor 3 specifically during the time period of an accident.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5f739081908bc05b2461f54828 |
completed | April 9, 2026, 9:38 p.m. |
| NER | Named-entity recognition | batch_69de2cf28df081908d897d7b9ec7939d |
completed | April 14, 2026, 12:02 p.m. |
| PD | Predicate disambiguation | batch_69dbc873052c8190b33ff7f7c5a4e7ee |
completed | April 12, 2026, 4:29 p.m. |
Created at: April 9, 2026, 10:17 p.m.