Triple

T13925418
Position Surface form Disambiguated ID Type / Status
Subject Praterinsel (Munich) E334850 entity
Predicate adjacentTo P224 FINISHED
Object Luitpoldbrücke E374639 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Luitpoldbrücke | Statement: [Praterinsel (Munich), adjacentTo, Luitpoldbrücke]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Luitpoldbrücke
Context triple: [Praterinsel (Munich), adjacentTo, Luitpoldbrücke]
  • A. Luitpoldbrücke chosen
    Luitpoldbrücke is a historic bridge in Munich that spans the Isar River and connects key parts of the city along Prinzregentenstraße.
  • B. Maximiliansbrücke
    Maximiliansbrücke is a historic bridge in Munich, Germany, that spans the Isar River and connects the city center with the Maximilianeum and surrounding districts.
  • C. Julius-Leber-Brücke bridge
    Julius-Leber-Brücke bridge is a railway overpass in Berlin, Germany, known for carrying train tracks over city streets in the Schöneberg district.
  • D. Hardbrücke
    Hardbrücke is a major road and railway bridge in Zurich, Switzerland, serving as an important traffic artery across the Limmat and nearby rail tracks.
  • E. Knesebeck Bridge
    Knesebeck Bridge is a bridge spanning the Teltow Canal in Berlin, Germany, serving as a local road and pedestrian crossing.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5f739081908bc05b2461f54828 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de2aa6cd9881908f652538f4613f37 completed April 14, 2026, 11:53 a.m.
NED1 Entity disambiguation (via context triple) batch_69fbac880f50819080011aef63f48dc8 completed May 6, 2026, 9:03 p.m.
Created at: April 9, 2026, 10:16 p.m.